Hilton Hotel
Download Case StudyChallenge:
Hilton Mumbai was facing an array of complex challenges in managing HVAC operations using its existing Building Management System (BMS). The Facility Management Team needed more than just a conventional BMS, seeking to transition from manual to fully automated HVAC operations. The team was in search of a best-in- class integrated solution that could offer enhanced control, visibility, and energy savings. Additionally, it required a solution that could facilitate remote management of its HVAC operations.
Solution:
Installation and Execution
Installation and commissioning at a hotel near Mumbai International Airport can be challenging due to the constant flow of travelers and high occupancy rates. However, 75F's out-of-the-box IoT-based BMS suite is known for its quick turnaround time, retrofit-friendly design, and ability to optimize HVAC operations in existing buildings. The installation team had to wait for the opportune moment when the AHUs were shut down to comply with operational requirements. Displaying patience, the 75F team efficiently deployed necessary solutions within a brief window of time.

Results:
Energy Savings
The Hilton Mumbai installation commenced in mid-June 2023 and was successfully completed by the end of October 2023, achieving full installation and commissioning within just four months. Energy data collection began in January 2024. Over a span of 18 months, the 75F solution delivered significant energy savings, reducing consumption by 273702 kWh on the Chiller plant and AHUs—equating to a 10% reduction compared to the baseline benchmark. This initiative also led to a notable decrease in CO2 emissions by 216 tons, equivalent to the carbon sequestered by 3202 tree seedlings over a decade. Additionally, the energy savings contributed to the annual electrification of 310 Indian homes, reinforcing a commitment to sustainability and environmental stewardship.
Fast and Easy Installation
The deep knowledge and rich expertise of the 75F installation and technical teams supported the Hilton facility management team with rapid installation, with just over 120 days for the installation and commissioning of the entire Hotel.
Energy Management Dashboards
To give complete visibility on all the key performance energy parameters, 75F’s Managed Services delivered customized dashboards to the Hilton facility management team.