<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=235914&amp;fmt=gif">

Enjoy the Video!

 

 
Before installing 75F, Merrick, Inc.’s legacy controls system was outdated and no longer supported. Due to insufficient monitoring and alerts, a heat pump failure that could not be solved for two months forced employees to wear their winter coats in the office. 
 

Merrick's geothermal system includes a three-pump station with no monitoring capabilities, two ERV units that ran 24/7, seven thermostats, 23 heat pumps and a greenhouse with a boiler and radiant in-floor heat. The organization's building is 52,000 square feet.

Watch our case study video or read about the installation to learn how 75F's Hydronic and Heat Pump Control solution solved Merrick's unique problems, reduced their electricity consumption by 24% and future-proofed the company's building system.

 

 

READ NOW

 

MerrickPage1